
This week they started the decking for the second floor underlayment.

Some of the connection of the floor joists to the steel for the rear deck.

Front of the shop with carpenters putting up the outside of the front deck.

Adam from Arch 11, the architect, going over the prints and verifying that the steel was in correctly. We passed with flying colors.
No comments:
Post a Comment