Front of the salon from the parking area, shows the closet and front picture window openings.
Front of the salon first floor as it will look from the street. The small concrete wall will be left exposed
Looking toward the east wall of the salon, with the framing laid out for construction tomorrow.
Steel for the second floor was delivere today. The crane is suppose to arrive sometime on Monday to install the second floor steel for the decks and supporting beams.