They pulled the forms for the foundation

Tuesday the forms were removed from the foundation and we can not get an idea of what the building is going to look like.
This photo shows the knee wall in the front of the shop. The smooth cement will be exposed and windows will go above it. The rough looking cement below will be covered with dirt. The door to the shop is facing the fence.
This is the east side of the building. Eventually there will be a porch here for the private entrance. But it takes a bit of imagination to envision what will be happening. The angle of this phone reflects the 3D image on the introduction, just as a point of reference.
This is the rear of the building from the alley. The entrance to the garage is on the right side and you are looking at the wall of the entrance to the private residence and a hallway. But it will be more visible in weeks to come when the framing starts.

The framing should starts next week, most likely on Monday, when the steel beams and the floor joists will be installed. So have a great 4th. I will be traveling to Nederland from LaGuardia in New York City on the 4th and hope to be there in time for the fireworks. See everyone next week.